Completed

  • Rail Car Bridge Replacement Project

    This project includes the replacement of an existing rail car bridge used for private property, WWTRRF staff, and Fire District staff access. The existing rail car bridge allowing access to the wastewater treatment and resource recovery facility (WWTRRF) outfall was damage during the April 2019 McKay Creek releases.  The north bridge abutment was damaged by erosion…

  • Solar Panels at WWTRRF

    Project will cover the Chlorine Contact Chamber at the Wastewater Treatment Resource Recovery Facility (WWTRRF) with solar panels. The solar array shading is designed to reduce facility power costs by integrating a renewable resource, providing at least 240-300 kilowatt hours of power. Additionally, placing the panels over the chlorine contact chamber provides shade to cool…

  • Well No. 11B Drilling Project

    This project is the first step of constructing a new well at the Wastewater Treatment Resource Recovery Facility. The project includes: Drilling and providing for a 24-inch surface casing to a 25-foot depth Drilling and providing for a 20-inch casing to a 260-foot depth Providing for the 20-inch casing to extend above surface level to…

  • Manhole Rehabilitation Project – 2022

    This project consists of mobilization, construction traffic control and infiltration correction of 90 sanitary sewer manholes. A map of rehabilitation manholes with existing sanitary sewer manhole photos is available at this link. This is the 2nd year of a 5-year project.  The overall focus of this project is to reduce inflow/infiltration (I/I) of groundwater into manholes located where…

  • Airport Runway 29 Threshold Relocation

    Major elements of work for the project include Relocation of the Runway 29 Threshold, construction of two new Runway 29 connector Taxiways, associated Medium Intensity Runway Lighting (MIRL) and Runway 29 and taxiway signage improvements, Runway 29 Precision Approach Path Indicator (PAPI) relocation and replacement, Runway 29 REIL relocation and replacement, and associated electrical improvements,…

  • LED Streetlight Conversion

    The City of Pendleton is converting over 1,000 existing public street lights to energy efficient, light-emitting diode (LED) fixtures to reduce the City’s energy costs, reduce maintenance, and reduce carbon emissions.  The project replaces existing High Pressure Sodium streetlight fixtures on public streets with new LED fixtures. The project does not add new or remove…

  • Bus Barn Facility

    The City of Pendleton operates public transit programs. This projects creates a facility to safely house transportation vehicles – up to four Category C buses, six Category E vehicles, and four minivan or sedan class vehicles – on 8.9 acres of undeveloped land adjacent to the Eastern Oregon Regional Airport. The facility will also provide storage,…

  • Til Taylor Park Rebuild

    The Til Taylor 101 Project, named for its completion on the 101st anniversary of Sheriff Til Taylor’s murder, revitalized one of Pendleton’s most historic parks. Project included: Two new playgrounds Splash pad to replace deteriorating wading pool Fenced-in dog park