  • 2020 Crack Seal

    Typically, alternative maintenance treatments, such as crack seals and slurry seals, should be applied to a street approximately every 7-10 years.  Crack sealing prevents vegetation from growing out of and water from entering into the cracks and sub-base, which could eventually cause soft areas and base failure, forcing full reconstruction of the road prematurely. Under…

  • 2020 Slurry Seal

    Treating streets with a condition ranking of satisfactory or good with a slurry seal rather than an asphalt overlay can stretch the maintenance dollars out by extending the life of the street without having to overlay them as soon. For this contract, we had bids ranging from $2.65/square yard from our low bidder to $3.99/square…

  • 2021 Manhole Rehabilitation Project

    The overall focus of this project is to reduce inflow/infiltration (I/I) of groundwater into manholes located where there is river influence contributing to groundwater getting inside the manholes. The wastewater treatment & resource recovery facility (WWTRRF) provides biological treatment of sanitary sewer collection flows. WWTRRF does not provide any treatment of groundwater entering the collection…

  • 2021 URD Street Reconstruction

    What work is being performed? Roadways will be completely reconstructed to address the subgrade failure. Catch basins and storm water pipe will be installed to improve and address drainage issues. Curb and gutter will be removed and replaced, as needed, to address drainage issues. Sidewalks will be removed and replaced, as needed, to address safety…

  • 2026 Slurry Seal

    Slurry seals help preserve and maintain streets.  For the 2026 season, the following streets are scheduled for slurry seal: 1430 SY SE 10th Street (SE Court Ave to SE Byers Ave) 1390 SY SE 19th Street (SE Byers to Dead End North) 1560 SY SE 4th Street  (SE Frazer Ave to SE Emigrant Ave) 1250…

  • 2022 Overlay & Reconstruction

    What work is being performed? Grind and inlay with 2” of asphalt. Address ADA ramps to meet Federal ADA standards. Remove and replace curb & gutter to improve drainage, address the lack of curb reveal, or repair damaged curbs. A few roadways will be completely reconstructed to address the subgrade failure. 2022 City Streets Overlay…

  • 2025 Reservoir Rehabilitation Project

    Two welded steel water storage tanks, the 1.8-million-gallon Water Filtration Plant (WFP) Clearwell and the 1.1-million-gallon Southwest Reservoir, are in need of rehabilitation and repairs. Work on each tank will include surface preparation, coating, removal and replacement of compromised materials, reinstallation of structural and operational components, sealing, and disinfection of tanks upon completion. Both projects require…

  • 2021 Crack/Slurry Seal

    Slurry sealing is a relatively low cost pavement treatment  that helps to preserve and prolong the life of the asphalt. Typically, a slurry seal treatment is performed following a crack seal treatment.   2021 Slurry Seal Project List: NE 1st Street (NE Despain Ave to NE Ellis Ave) NW Bailey Avenue (175FT W of Main…

  • 2025 Reservoir Coating Project

    This project is to recoat the inside of two Pendleton water tanks: The Clearwell Tank at the Water Filtration Plant and the Southwest Reservoir.  Work will include surface preparation, coating, removal and replacement of compromised materials, reinstallation of structural and operational components, sealing, and disinfection of tanks upon completion.  The Clearwell project involves removal and replacement of baffling, repair or replacement of deteriorated steel and rafter supports,…