  • NE Ellis Water Main

    This project is the final piece to connect the SE Byers Avenue water system to the North Hill system to provide better water flow and redundancies. Two phases of the system connection have already been completed: The SE 8th Street Bridge Project provided the 12″ connection across the Umatilla River A project from the NE…

  • Water System Insertion Valves

    This project would install two insertion valves in an area in need in the water distribution system.  For water system maintenance and repair, such as replacing broken valves, crews typically isolate a small area affecting a few customers at a time. The impacted area does not have the ability to isolate, and repairs could require…

  • SE 3rd Street Reconstruction

    This is a planned reconstruction for the 2023 construction season to rebuild the portion of SE 3rd Street from Frazer to Stillman Park, including a new storm drainage system. Roadways will be completely reconstructed to address the subgrade failure. Catch basins and storm water pipe will be installed to improve and address drainage issues. Curb…

  • East End Booster Pump Station

    booster pump station contains multiple pumps and all the equipment necessary to control those pumps to maintain water pressure in an area. The East End Booster Pump Station includes provisions to serve the Hwy 11/30 Connector Road area with about 270 developable acres.  Depending on property acquisition and Business Oregon Infrastructure Finance Authority Board approval April 7,…

  • Lift Station 5 Design

    The project completes the Engineering services and Preliminary Design Report. The eventual project would provide: A new 48” sewer manhole with approximately 15 LF of 18-inch gravity sewer connecting the new manhole and a new sewer lift station. A new packaged sewer lift station with two submersible pumps, each with a capacity of approximately 475…