Completed

  • West Primary Clarifier Coating

    This project is to protect the West Primary Clarifier from erosion and acid attack that happens in wastewater environments. The launder (outside ring) where the water is moving faster and cascading down a wall is where most of the erosion takes place. Over time this erosion will expose aggregate and, left unchecked, can cause structural…

  • NE Ellis Water Main

    This project is the final piece to connect the SE Byers Avenue water system to the North Hill system to provide better water flow and redundancies. Two phases of the system connection have already been completed: The SE 8th Street Bridge Project provided the 12″ connection across the Umatilla River A project from the NE…

  • Lift Station 5 Design

    The project completes the Engineering services and Preliminary Design Report. The eventual project would provide: A new 48” sewer manhole with approximately 15 LF of 18-inch gravity sewer connecting the new manhole and a new sewer lift station. A new packaged sewer lift station with two submersible pumps, each with a capacity of approximately 475…

  • UAS Industrial Park South Improvements

    South improvements generally consist of: Gravity sewer Sewer force main Water distribution line Gas, primary power, telecommunication utilities Mobilization, traffic control, erosion control, and all other work associated with the work Specifics: Multiple steel casings across an existing taxiway and runway for water, sewer, power, and fiber/telecommunications utilities. Approximately 1,400 LF 6-inch diameter sewer force…