2020 Slurry Seal

Treating streets with a condition ranking of satisfactory or good with a slurry seal rather than an asphalt overlay can stretch the maintenance dollars out by extending the life of the street without having to overlay them as soon.
For this contract, we had bids ranging from $2.65/square yard from our low bidder to $3.99/square yard. Asphalt overlays typically costs up to 10 times as much per square yard compared to a slurry seal. Overlay type of maintenance treatment is required on roads that fall below the satisfactory ranking. This slurry seal project bid will treat approximately 59 city blocks.
- 3,559 SY NW 11th Street (NW Despain Ave to NW Gilliam Ave)
- 3,570 SY NW 8th Street (NW Carden Ave to NW Furnish Ave)
- 1,143 SY NW 9th Street (NW Despain Ave to NW Ellis Ave)
- 1,728 SY NW Bailey Avenue (NW 6th St. to NW 8th St.)
- 1,796 SY NW Ellis Avenue (NW 10th St. to NW 12th St.)
- 1,824 SY NW Gilliam Avenue (NW 4th St. to NW 6th St.)
- 1,643 SY NW Furnish Avenue (N Main St. to NW 4th St.)
- 1,296 SY SW 10th Street (SW Court Ave to S. Bridge Deck)
- 403 LF Traffic Striping SW 10th Street(SW Court Ave to S. Bridge Deck)
- 932 SY SW 28th Street (SW Marshall Ave to SW Nye Ave)
- 4,653 SY SW 24th Street (SW Perkins Ave to Dead End South)
- 3,167 SY SW Jay Avenue (SW 30th St. to SW 31st St.)
- 4,356 SY SW Jay Avenue (SW 32nd St. to SW 37th St.)
- 2,501 SY SW Isaac Avenue (SW Jay Ave to SW 32nd St.)
- 3,141 SY SW Isaac Avenue (SW 30th St. to SW 31st St.)
- 2,072 SY SW Ladow Avenue (SW 23rd St. to SW 25th St.)
- 4,186 SY SW Ladow Avenue (SW 28th St. to Dead End West)
- 3,244 SY SW Ladow Avenue (SW 33rd St. to SW 37th St.)
- 3,489 SY SW Nye Avenue (SW Perkins Ave to SW Marshall Ave)
- 4,986 SY SW 33rd Street (SW Jay Ave to SW Perkins Ave)
- 4,419 SY SW Perkins Avenue (SW 33rd St. to Rooster’s Back Driveway)
- 4,563 SY SW 39th Street (SW 40th St. to SW 41st St.)
- 3,161 SY SW Quinney Place (SW 1st St. to SW 3rd St.)
- 1,334 SY SW 2nd Street (SW Quinney Pl to Dead End South)
- 3,664 SY Tutuilla Road (SW Athens Ave to 100’ S. of SW Tahoe Ave)
- 2,844 LF Traffic Striping Tutuilla Road (SW Athens Ave to 100’ S. of SW Tahoe Ave)
Funding
City Council has provided additional funding through a variety of sources to bring the available Street Fund capital outlay for street preservation to $1.2 million annually, with $440,000 targeted to neighborhood streets (non-collector, non-arterial). Within the $440,000, 30%, or $132,000 is to be targeted to worst case condition residential streets.
| Project Title: | 2020 Slurry Seal |
| Estimated Construction Cost: | TBD |
| Actual Construction Cost: | 190,203.25 |
| Project Type: | Streets |
| Final Project Cost (Construction + Engineering): | 205,419.51 |
| Year Completed: | 2020 |
Why It's Needed
Street preservation funding is used to maintain City owned streets. The street system has not had adequate funding to have all streets maintained in good condition. Council recently increased the funding from $800,000 to $1,200,000 annually. Council is working on securing additional funding of $1,000,000 annually. This would bring the total funding goal to $2,200,000 for 10-years to address the overall very poor, poor, and fair condition of City owned streets in the community. Without increased funding targeted to streets, the overall condition of the streets will continue to deteriorate. The overall goal is to get all streets to be in good condition and have adequate funds to maintain them in that condition for future generations.
Address
Additional Links:
Project Status
Completed
Project Milestones
Contract for City-wide Street Slurry Seal project awarded to the low bidder, Blackline, Inc., for $190,203.25.