What work is being performed?
- Roadways will be completely reconstructed to address the subgrade failure.
- Catch basins and storm water pipe will be installed to improve and address drainage issues.
- Curb and gutter will be removed and replaced, as needed, to address drainage issues.
- Sidewalks will be removed and replaced, as needed, to address safety issues and to ensure compliance with ADA standards.
- ADA ramps will be installed to meet Federal ADA standards.
2022 Urban Renewal District Street Reconstruction Project
Funding
Urban Renewal
| Project Title: | 2022 URD Street Reconstruction |
| Estimated Construction Cost: | TBD |
| Actual Construction Cost: | TBD |
| Project Type: | |
| Final Project Cost (Construction + Engineering): | TBD |
| Year Completed: | 2022 |
Address
500 SW Dorion Ave, Pendleton, OR 97801, USA
Project Status