What work is being performed?
- Roadways will be completely reconstructed to address the subgrade failure.
- Catch basins and storm water pipe will be installed to improve and address drainage issues.
- Curb and gutter will be removed and replaced, as needed, to address drainage issues.
- Sidewalks will be removed and replaced, as needed, to address safety issues and to ensure compliance with ADA standards.
- ADA ramps will be installed to meet Federal ADA standards.
2022 Urban Renewal District Street Reconstruction Project
1 SE Byers Avenue & SE 4th Street Reconstruction
2 SW 10th Street Reconstruction Project
Funding
Urban Renewal
Project Title:
2022 URD Street Reconstruction
Estimated Construction Cost:
TBD
Actual Construction Cost:
TBD
Project Type:
Final Project Cost (Construction + Engineering):
TBD
Year Completed: