NW 3rd Water Line Replacement
This project includes a water line replacement and upgrade along Northwest Third Street from Furnish to Northwest Horn Avenue.
This project includes a water line replacement and upgrade along Northwest Third Street from Furnish to Northwest Horn Avenue.
The project includes the construction of a new Administration Building at the Wastewater Treatment Resource Recovery Facility, which will bring the facility into compliance with ADA accessibility requirements for both staff and the public, as well as meet OSHA safety regulations. A new Warehouse will also be constructed to provide secure, compliant storage for chemical…
This project involves the rehabilitation of the West Secondary Clarifier at the Wastewater Treatment Resource Recovery Facility (WWTRRF) for the City of Pendleton. This includes work to the existing clarifier mechanism, repair of cracks in the concrete stump, Installation of pressure relief valves in the clarifier floor and other equipment, as well as startup and…
The floods of 2019 and 2020 in the McKay Creek Basin revealed a need for solutions to improve flood protection, floodplain connectivity, and aquatic habitat in lower McKay Creek. This multi-benefit planning and design project will identity and plan vitally needed projects, policies, and programs that provide flood conveyance and protection while also improving floodplain…
The City of Pendleton is interested in improving water quality, distribution system flow, pressure, and redundancy, and improving hydraulic conditions directly related to fire flows and system pressure in the North Hill area of their water distribution system. As part of the 2024 Water System Master Plan, a number of improvements were identified in the…
Part of the Highway 11-Highway 30 Connector Road project and part of the Rees-Goad property development, this project will construct the SE Rees-Goad Way Street Extension. The street will begin at the western end of SE Rees-Goad Way (formerly SE Kirk Avenue) near Southeast 15th Street, which was completed in September 2024, and travel through…
Pendleton awarded $2.5 million grant for Fire Station 2 Grant will allow for earthquake preparedness at aging station Business Oregon has awarded Pendleton Fire & Ambulance a grant for just under $2.5 million for seismic rehabilitation of Fire State 2. Opened in 1972, Fire Station 2 is staffed with firefighter paramedics 24/7 and serves the…
This project replaces and upgrades components of the secondary digester complex at the Wastewater Treatment Resource Recovery Facility. Improvements are needed to replace aging equipment, ensure redundancy, and address equipment-SCADA connectivity limitations. An external pump mix system, ferric chloride injection, new boiler, new booster pump, new heat exchanger, and new piping and valves was recommended…
This project will install a 500 kW Battery Energy Storage System (BESS) at the Wastewater Treatment Resource Recovery Facility (WWTRRF). This system will maximize the utilization of renewable energy produced onsite by storing energy generated from existing renewable energy systems and discharging it during high-demand periods. The project aligns with the City’s commitment to sustainability…
Historic building donated to city by Bisnett family For decades, the historic Christian Science Church building on the corner of Main Street and Byers has sat mostly empty. Now, the Pendleton City Council will consider options for the historic building and a potential adjoining plaza project. The Christian Science building, 13 SW Byers Ave., was…