Streets

  • 2021 URD Street Reconstruction

    What work is being performed? Roadways will be completely reconstructed to address the subgrade failure. Catch basins and storm water pipe will be installed to improve and address drainage issues. Curb and gutter will be removed and replaced, as needed, to address drainage issues. Sidewalks will be removed and replaced, as needed, to address safety…

  • 2022 Overlay & Reconstruction

    What work is being performed? Grind and inlay with 2” of asphalt. Address ADA ramps to meet Federal ADA standards. Remove and replace curb & gutter to improve drainage, address the lack of curb reveal, or repair damaged curbs. A few roadways will be completely reconstructed to address the subgrade failure. 2022 City Streets Overlay…

  • 2021 Crack/Slurry Seal

    Slurry sealing is a relatively low cost pavement treatment  that helps to preserve and prolong the life of the asphalt. Typically, a slurry seal treatment is performed following a crack seal treatment.   2021 Slurry Seal Project List: NE 1st Street (NE Despain Ave to NE Ellis Ave) NW Bailey Avenue (175FT W of Main…

  • 2024 Slurry Seal

    Treating streets with a condition ranking of satisfactory or good with a slurry seal rather than an asphalt overlay can stretch the maintenance dollars out by extending the life of the street without having to overlay them as soon. Work to be performed consists of slurry sealing approximately 68,245 SY on identified sections of City of…

  • 2022 Slurry Seal

    Slurry sealing is a relatively low cost pavement treatment  that helps to preserve and prolong the life of the asphalt.  Typically, a slurry seal treatment is performed following a crack seal treatment.   2022 Slurry Seal Project List: NW Johns Lane (N Main St to NW 4th St) SW 10th Court (SW Nye Ave to…