The project completes the Engineering services and Preliminary Design Report. The eventual project would provide:

A new 48” sewer manhole with approximately 15 LF of 18-inch gravity sewer connecting the new manhole and a new sewer lift station. A new packaged sewer lift station with two submersible pumps, each with a capacity of approximately 475 gpm at 74 ft TDH. A new 1,500 LF 6-inch sewer force main exiting the new lift station and feeding into an existing manhole with a gravity sewer main. A new 1,500 LF 8-inch force main running adjacent to the new 6” force main from a new intertie vault to the existing manhole. A new intertie, meter, and valve vault connecting the 6-inch and 8-inch force main and providing valving and metering functionality.

This project completes the design work for this project.

Project Title:
Lift Station 5 - Design Only
Estimated Construction Cost:
TBD
Actual Construction Cost:
$100,862
Project Type:
Final Project Cost (Construction + Engineering):
$100,862
Year Completed:
Address

Intersection Airport Road and NW Stage Gulch Road
Pendleton, OR 97801
United States

Project Status

Project Milestones

Project Milestones
Date
August 2021
Milestone Description

MurraySmith submitted 90% design documents

Date
December 2021
Milestone Description

Final design completed