Approximately 1,500 LF of 8-inch and 12-inch diameter replacement gravity sewer with associated manholes draining to an existing gravity sewer. Approximately 300 LF of trenchless steel casing across existing railroad for gravity sewer utility. Asphalt road surface restoration built to the City’s industrial standard and associated earthwork and drainage improvements.
- Bypass pumping plan as shown on sheet C-1
- Demolition as shown on sheet C-2
- Gravity sewer as shown on sheets C-3 to C-6
- Mobilization, traffic control, erosion control, and all other work associated with the work generally delineated above.
Funding
The City secured a Drinking Water State Revolving Fund loan of $14,855,000 and a Clean Water State Revolving Fund loan of $9,800,000 to assist with water distribution and sewer collection master planning projects. This project is solely a sewer collection system project and adequate CWSRF loan funds are available for this project.
SE 4th STreet
Pendleton, OR 97801
United States
Project Milestones
Contract awarded to DW Excavating, Davenport, WA, for the SE 4th Street Gravity Sewer Replacement Project in the amount of $1,592,165.00