UAS Industrial Park South Improvements

Project Image
Project work

South Improvements generally consist of:

  • Gravity sewer
  • Sewer force main
  • Water distribution line
  • Gas, primary power, telecommunication utilities
  • Mobilization, traffic control, erosion control, and all other work associated with the work

 

Specifics:

Multiple steel casings across an existing taxiway and runway for water, sewer, power, and fiber/telecommunications utilities. Approximately 1,400 LF 6-inch diameter sewer force main, approximately 4,200 LF of 8- and 12-inch diameter gravity sewer with associated manholes, and connection to the existing system. Approximately 4,300 LF of 18-inch diameter water distribution line with associated fire hydrants, valves, fittings, water service connections, and associated surface restoration. Approximately 1,300 LF of 6-inch conduit and associated concrete vaults for future power utility installation. Approximately 1,300 LF of (6) 1 1/4-inch diameter conduits and associated concrete vaults for future communications installations.  

Funding:

City secured Drinking Water State Revolving Loan Funds of $14,855,000 and a Clean Water State Revolving Loan Fund of $9,800,000 to assist with this approved master planning project. Loan funds are available for this project.

Coordination of the UAS Phase IV Industrial Park South Improvements and the Airport Improvement Project for Runway 7-25 major rehabilitation work is providing cost savings in allowing the open trench installation vs direction boring. This savings was anticipated to be around $1.5 million based on the engineer’s estimate. 

Project Title:
Unmanned Aerial Systems Phase IV Industrial Park: South Improvements
Estimated Construction Cost:
4,200,000
Actual Construction Cost:
2,822,514.89
Project Type:
Final Project Cost (Construction + Engineering):
2,991,865.78
Year Completed:
Why It's Needed
Improvements to the Unmanned Aerial Systems Phase IV Industrial Park are designed to enhance economic development at the City's Industrial Park at the Eastern Oregon Municipal Airport.
Address

4529 NW A Ave
Pendleton, OR 97801
United States

Project Status

Project Milestones

Project Milestones
Date
May 2019
Milestone Description

Bid awarded to Pioneer Asphalt, dba Pioneer Construction, for the Unmanned Aerial Systems (UAS) Phase IV Industrial Park: South Improvements in the amount of $2,822,514.89.

Date
May 2020
Milestone Description

Project completed

Address Geolocation