What work is being performed?
- Roadways will be completely reconstructed to address the subgrade failure.
- Catch basins and storm water pipe will be installed to improve and address drainage issues.
- Curb and gutter will be removed and replaced, as needed, to address drainage issues.
- Sidewalks will be removed and replaced, as needed, to address safety issues and to ensure compliance with ADA standards.
- ADA ramps will be installed to meet Federal ADA standards.
2021 Urban Renewal District Street Reconstruction Project
1 SE 7th Street (SE Emigrant Avenue to SE Dorion Avenue)
2 SE 6th Street (SE Emigrant Avenue to SE Court Avenue)
3 SW 7th Street (SW Dorion Avenue to SW Court Avenue)
4 SW 8th Street (SW Frazer Avenue to SW Emigrant Avenue)
5 SW 7th Street (SW Frazer Avenue to SW Emigrant Avenue)
6 SW 4th Street (SW Emigrant Avenue to SW Court Avenue)
Project Title:
2021 Urban Renewal District Street Reconstruction Project
Estimated Construction Cost:
$1,189,632
Actual Construction Cost:
$1,189,632
Project Type:
Final Project Cost (Construction + Engineering):
$1,284,802