2022 Slurry Seal

Project Image
""

Slurry sealing is a relatively low cost pavement treatment  that helps to preserve and prolong the life of the asphalt.  Typically, a slurry seal treatment is performed following a crack seal treatment.  

2022 Slurry Seal Project List:

1 NW Johns Lane (N Main St to NW 4th St)

2 SW 10th Court (SW Nye Ave to Cul-de-sac)

3 SW 11th Court (SW Nye Ave to Cul-de-sac)

4 SW 12th Drive (SW Nye Ave to End of Pavement N)

5 SW Alpha Court (SW Athens Ave to Cul-de-sac)

6 SW Theta Court (SW Athens Ave to Cul-de-sac)

7 SW 21st Street (SW Nye Ave to Dead End N at Gate)

8 SW 25th Street (SW Marshall Ave to SW 30th St)

9 SW Quinney Avenue (100ft W of SW 22nd Ave to End of Pavement SE)

10 SW Runnion Lane (Lot #1885/Pave Change to Cul-de-sac S)

11 SW Quinney Lane (SW Quinney Ave to Cul-de-sac NE)

12 SW Marshall Court (SW 37th St to Cul-de-sac E)

13 SW Marshall Place (SW 37th St to Cul-de-sac W

14 SW 37th Court (SW 37th St to Cul-de-sac E)

15 SW 40th Place (SW 40th St to Cul-de-sac NE)

16 SW Perkins Lane (SW Perkins Ave to Cul-de-sac E)

17 SW Perkins Court (SW Perkins Ave to Cul-de-sac SW)

18 SW 46th Street (SW Perkins Ave to SW Olson St)

19 SW Runnion Court (SW 44th St to Cul-de-sac E)

20 SW 45th Street (SW Korvola Rd to Cul-de-sac N)

21 SW River View Drive (SW 28th St to 100ft W of Overlook)

22 SW Overlook Street (SW Riverview Drive to SW Terrace Dr)

23 SW Overlook Place (SW Overlook St to Cul-de-sac NW)

24 SW Terrace Drive (SW Riverview Drive to Change in Pavement/Lot 3010)

25 NW Westgate Drive (Railroad Tracks to SW Westgate Drive)

26 SW Westgate Drive (NW Westgate Dr to End of Pavment E)

27 SW Westgate Drive (NW Westgate Dr to End of Pavement W)

28 NW Pioneer Place (Reith Road to Gate)

29 SW Golden Avenue (Rieth Rd to Dead End W)

30 NW 57th Drive (SW Golden Ave to Cul-de-sac N)

31 NW 56th Drive (NW A Avenue to Cul-de-sac N)

32 Convention Center Parking Lot

Project Title:
2022 Slurry Seal Project
Estimated Construction Cost:
$413,544.49
Actual Construction Cost:
$362,581.38
Project Type:
Final Project Cost (Construction + Engineering):
$391,587.89
Year Completed:
Why It's Needed
Slurry seals help prevent and correct surface distresses caused by weather, water, and general pavement deterioration, by waterproofing the road surface and protecting the underlying asphalt surface from further deterioration.
Address

500 SW Dorion Ave
Pendleton, OR 97801
United States

Project Status

Project Milestones

Project Milestones
Date
April 2022
Milestone Description

Bid awarded to *Doolittle Construction LLC, of Snoqualmie, WA, for *$362,581.38

 

Address Geolocation