Project Image

Install 16” water line as part of the Water System Master Plan
The ultimate need for the installation of this 16” water line is to increase the overall capacity of the City’s water supply system. By connecting the drinking water well that is presently located down near the Resource Recovery Facility/Waste Water Treatment Plant (RRF/WWTP), called Well 11, to the City’s gravity zone distribution system, some 4,100 feet away at the top of Houtama Road the entire water supply system will see a benefit, especially in the southwest end of town.
Project Title:
SW Houtama Road Water Line
Estimated Construction Cost:
$1,196,169.25
Actual Construction Cost:
$1,073,815.00
Project Type:
Final Project Cost (Construction + Engineering):
1,159,720
Year Completed:
Why It's Needed
Increase the overall capacity of the City’s water supply system.
Address
4300 SW Houtama Road
Pendleton, OR 97801
United States
Additional Links:
Project Status
Project Milestones
Project Milestones
Date
May 10, 2022
Milestone Description
Bid Awarded To: Silver Creek Contracting, LLC
Award Amount: $1,073,815.00
Date
December 2022
Milestone Description
Houtama Water Line placed into service December 2022.