Lift Station 5 Design

The project completes the Engineering services and Preliminary Design Report. The eventual project would provide:
A new 48” sewer manhole with approximately 15 LF of 18-inch gravity sewer connecting the new manhole and a new sewer lift station. A new packaged sewer lift station with two submersible pumps, each with a capacity of approximately 475 gpm at 74 ft TDH. A new 1,500 LF 6-inch sewer force main exiting the new lift station and feeding into an existing manhole with a gravity sewer main. A new 1,500 LF 8-inch force main running adjacent to the new 6” force main from a new intertie vault to the existing manhole. A new intertie, meter, and valve vault connecting the 6-inch and 8-inch force main and providing valving and metering functionality.
This project completes the design work for this project.
| Project Title: | Lift Station 5 - Design Only |
| Estimated Construction Cost: | TBD |
| Actual Construction Cost: | $100,862 |
| Project Type: | Wastewater |
| Final Project Cost (Construction + Engineering): | $100,862 |
| Year Completed: | 2021 |
Address
Project Status
Completed
Project Milestones
MurraySmith submitted 90% design documents
Final design completed